Project Cargo Logistics

Wind Turbine Blade Transport: Tianjin to Inner Mongolia Project Site

A wind energy company needed to transport 12 sets of 78-meter wind turbine blades from Tianjin port to an Inner Mongolia wind farm. Meicheng engineered a heavy-haul route with police escort and bridge reinforcement.

クライアント

North China WindPower Energy Co.

業界

Renewable Energy

サービス

Project Cargo Logistics

ルート

Tianjin Port, China → Ulanqab, Inner Mongolia, China

貨物タイプ

Wind turbine blades, 78m length each, 12 sets (36 blades), 25 tons per blade

78m
Blade Length
36
Blades Delivered
600
km Distance
38
Days Completed

課題

Client Background

WindPower Energy was constructing a 200MW wind farm in Ulanqab, Inner Mongolia. They needed to transport 36 wind turbine blades (78 meters each) from Tianjin Port to the project site, a distance of 600 km through mountainous terrain and rural roads.

Key Challenges

ソリューション

Solution Overview

Meicheng engineered a complete heavy-haul transport solution including route survey, bridge reinforcement, multi-province permitting, and specialized blade-transport trailers with police escort.

Key Actions

成果

Results

The wind farm was commissioned on schedule in November, generating 200MW of renewable energy. WindPower Energy has since contracted Meicheng for 2 additional wind farm projects in Hebei and Gansu.