
Project Cargo Logistics
Wind Turbine Blade Transport: Tianjin to Inner Mongolia Project Site
A wind energy company needed to transport 12 sets of 78-meter wind turbine blades from Tianjin port to an Inner Mongolia wind farm. Meicheng engineered a heavy-haul route with police escort and bridge reinforcement.
Client
North China WindPower Energy Co.
Industrie
Renewable Energy
Serviciu
Project Cargo Logistics
Rută
Tianjin Port, China → Ulanqab, Inner Mongolia, China
Tipul de marfă
Wind turbine blades, 78m length each, 12 sets (36 blades), 25 tons per blade
